{"id":13097,"date":"2026-06-16T13:15:05","date_gmt":"2026-06-16T10:15:05","guid":{"rendered":"https:\/\/euroports.fi\/?p=13097"},"modified":"2026-06-16T13:15:06","modified_gmt":"2026-06-16T10:15:06","slug":"lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa","status":"publish","type":"post","link":"https:\/\/euroports.fi\/en\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/","title":{"rendered":"Decade Long Vectron Locomotive Lifting Project Completed in Hanko"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"13097\" class=\"elementor elementor-13097\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fc2b40f e-flex e-con-boxed e-con e-parent\" data-id=\"fc2b40f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-483d2610 elementor-widget elementor-widget-text-editor\" data-id=\"483d2610\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<p><strong>Euroports has successfully completed a decade long Vectron locomotive lifting project at the Port of Hanko in cooperation with <a href=\"https:\/\/www.mobility.siemens.com\/fi\/fi.html\" target=\"_blank\" rel=\"noopener\">Siemens Mobility.<\/a> Launched in 2016, the project involved lifting a total of 80 Vectron electric locomotives onto the Finnish railway network for VR Group.<\/strong><\/p>\n\n<p>Throughout the project, the Port of Hanko served as a key entry point for locomotive deliveries to Finland. As the port operator, Euroports was responsible for local operations, risk assessments, safety management, and coordination between port and rail activities.<\/p>\n\n<p>The project concluded in spring 2026 with the arrival of the final three locomotives. All 80 liftings were completed according to plan and without operational disruptions or safety incidents.<\/p>\n\n<p>\u201cA lot has changed over the last decade but completing a 10-year project without a single incident shows that some things have remained constant. Those constants are strong and trusting relationships between business partners, the ability to find alternative solutions when challenges appear and a shared commitment to doing the job safely, professionally, and with pride.\u201d<br \/>\u2014 G\u00f6ran Eriksson, Commercial Manager, Euroports Hanko Oy<\/p>\n\n<p>The Vectron electric locomotives represent one of VR Group\u2019s largest railway equipment investments to date, with a total value exceeding EUR 300 million. Handling high value machinery in a port environment requires precise execution, repeatable lifting processes, and accurate timing within the delivery chain.<\/p>\n\n<p>Euroports\u2019 specialist expertise in complex project cargo and railway equipment handling was central to meeting these requirements. Advanced lifting equipment, experienced personnel, and well established operating procedures enabled predictable, high quality performance across multiple delivery batches.<\/p>\n\n<p>The successful execution of the project was supported by close cooperation between Euroports and Siemens Mobility. Continuous communication and proactive coordination ensured that port operations remained aligned with delivery schedules and technical requirements throughout all phases.<\/p>\n\n<p>\u201cThe successful handling and delivery of all 80 Vectron locomotives to Finland demonstrates what strong and reliable cooperation across partners can achieve. Euroports has been a trusted partner throughout this project, ensuring smooth and efficient logistics operations at every stage. Together, we have contributed to enabling modern, efficient, and more sustainable rail operations in Finland.\u201d<br \/>\u2014 Juha Lehtonen, CEO, Siemens Mobility Oy<\/p>\n\n<p>Delivered in phases over the course of the project, the locomotives have since been fully integrated into VR Group\u2019s fleet for passenger and freight transport. To date, the fleet has completed around 72 million kilometres in operation.<\/p>\n\n<p>The completion of the Vectron locomotive lifting project further reinforces Euroports\u2019 position as a trusted logistics partner for demanding project cargo, demonstrating our capability to support major rail investments through safe, efficient, and reliable port operations.<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-fcb9ded e-flex e-con-boxed e-con e-parent\" data-id=\"fcb9ded\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5e16992 elementor-widget elementor-widget-gallery\" data-id=\"5e16992\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;columns&quot;:2,&quot;lazyload&quot;:&quot;yes&quot;,&quot;gallery_layout&quot;:&quot;grid&quot;,&quot;columns_tablet&quot;:2,&quot;columns_mobile&quot;:1,&quot;gap&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:10,&quot;sizes&quot;:[]},&quot;gap_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:10,&quot;sizes&quot;:[]},&quot;gap_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:10,&quot;sizes&quot;:[]},&quot;link_to&quot;:&quot;file&quot;,&quot;aspect_ratio&quot;:&quot;3:2&quot;,&quot;overlay_background&quot;:&quot;yes&quot;,&quot;content_hover_animation&quot;:&quot;fade-in&quot;}\" data-widget_type=\"gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-gallery__container\">\n\t\t\t\t\t\t\t<a class=\"e-gallery-item elementor-gallery-item elementor-animated-content\" href=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020094-scaled.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"5e16992\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTMxMzQsInVybCI6Imh0dHBzOlwvXC9ldXJvcG9ydHMuZmlcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzA2XC9QMTAyMDA5NC1zY2FsZWQuanBnIiwic2xpZGVzaG93IjoiNWUxNjk5MiJ9\">\n\t\t\t\t\t<div class=\"e-gallery-image elementor-gallery-item__image\" data-thumbnail=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020094-300x225.jpg\" data-width=\"300\" data-height=\"225\" aria-label=\"\" role=\"img\" ><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-gallery-item__overlay\"><\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<a class=\"e-gallery-item elementor-gallery-item elementor-animated-content\" href=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"5e16992\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTMxMDAsInVybCI6Imh0dHBzOlwvXC9ldXJvcG9ydHMuZmlcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzA2XC9QMTAyMDA1OC1zY2FsZWQuanBnIiwic2xpZGVzaG93IjoiNWUxNjk5MiJ9\">\n\t\t\t\t\t<div class=\"e-gallery-image elementor-gallery-item__image\" data-thumbnail=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-300x225.jpg\" data-width=\"300\" data-height=\"225\" aria-label=\"Vectron-veturi nostetaan raiteille\" role=\"img\" ><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-gallery-item__overlay\"><\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<a class=\"e-gallery-item elementor-gallery-item elementor-animated-content\" href=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020098-scaled.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"5e16992\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTMxMDEsInVybCI6Imh0dHBzOlwvXC9ldXJvcG9ydHMuZmlcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzA2XC9QMTAyMDA5OC1zY2FsZWQuanBnIiwic2xpZGVzaG93IjoiNWUxNjk5MiJ9\">\n\t\t\t\t\t<div class=\"e-gallery-image elementor-gallery-item__image\" data-thumbnail=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020098-300x225.jpg\" data-width=\"300\" data-height=\"225\" aria-label=\"Vectron-veturi nostetaan raiteille\" role=\"img\" ><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-gallery-item__overlay\"><\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<a class=\"e-gallery-item elementor-gallery-item elementor-animated-content\" href=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/Picture3-scaled.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"5e16992\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTMxMTksInVybCI6Imh0dHBzOlwvXC9ldXJvcG9ydHMuZmlcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzA2XC9QaWN0dXJlMy1zY2FsZWQuanBnIiwic2xpZGVzaG93IjoiNWUxNjk5MiJ9\">\n\t\t\t\t\t<div class=\"e-gallery-image elementor-gallery-item__image\" data-thumbnail=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/Picture3-300x160.jpg\" data-width=\"300\" data-height=\"160\" aria-label=\"Port of Hanko\" role=\"img\" ><\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-gallery-item__overlay\"><\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen kymmenen vuotta kest\u00e4neen Vectron-veturien nostoprojektin Hangon satamassa yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa. Vuonna 2016 k\u00e4ynnistynyt projekti sis\u00e4lsi yhteens\u00e4 80 Vectron-s\u00e4hk\u00f6veturin nostamisen Suomen rataverkolle VR Groupin k\u00e4ytt\u00f6\u00f6n. Projektin aikana Hangon satama toimi veturitoimitusten keskeisen\u00e4 maahantuloporttina Suomeen. Satamaoperaattorina Euroports vastasi paikallisista operaatioista, riskienarvioinnista, turvallisuuden hallinnasta sek\u00e4 satama- ja rautatieoperaatioiden yhteensovittamisesta. Projekti p\u00e4\u00e4ttyi kev\u00e4\u00e4ll\u00e4 [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":13100,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-13097","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":{"hide_featured_image":false,"separate_image":null},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa - Euroports Finland<\/title>\n<meta name=\"description\" content=\"Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen 10 vuotta kest\u00e4neen Vectron-veturien nostoprojektin yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/euroports.fi\/en\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa - Euroports Finland\" \/>\n<meta property=\"og:description\" content=\"Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen 10 vuotta kest\u00e4neen Vectron-veturien nostoprojektin yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/euroports.fi\/en\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/\" \/>\n<meta property=\"og:site_name\" content=\"Euroports Finland\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-16T10:15:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-16T10:15:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Viola Juuso\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Viola Juuso\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/\"},\"author\":{\"name\":\"Viola Juuso\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#\\\/schema\\\/person\\\/1a4b0c0893e447c80e5dbba4f43c9492\"},\"headline\":\"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa\",\"datePublished\":\"2026-06-16T10:15:05+00:00\",\"dateModified\":\"2026-06-16T10:15:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/\"},\"wordCount\":360,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/euroports.fi\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/P1020058-scaled.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/\",\"url\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/\",\"name\":\"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa - Euroports Finland\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/euroports.fi\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/P1020058-scaled.jpg\",\"datePublished\":\"2026-06-16T10:15:05+00:00\",\"dateModified\":\"2026-06-16T10:15:06+00:00\",\"description\":\"Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen 10 vuotta kest\u00e4neen Vectron-veturien nostoprojektin yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/euroports.fi\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/P1020058-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/euroports.fi\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/P1020058-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"Vectron-veturi nostetaan raiteille\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/uncategorized\\\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/euroports.fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/euroports.fi\\\/en\\\/\",\"name\":\"Euroports Finland\",\"description\":\"T\u00e4yden palvelun satamaoperaattori.\",\"publisher\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/euroports.fi\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#organization\",\"name\":\"Euroports Finland\",\"url\":\"https:\\\/\\\/euroports.fi\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/euroports.fi\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/cropped-euroports_logo.png\",\"contentUrl\":\"https:\\\/\\\/euroports.fi\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/cropped-euroports_logo.png\",\"width\":350,\"height\":100,\"caption\":\"Euroports Finland\"},\"image\":{\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/euroports.fi\\\/en\\\/#\\\/schema\\\/person\\\/1a4b0c0893e447c80e5dbba4f43c9492\",\"name\":\"Viola Juuso\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e50391ca51e3f417d0532ca37d5764c3fcee1110d6d9c4a1f55d67e5d6b1677c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e50391ca51e3f417d0532ca37d5764c3fcee1110d6d9c4a1f55d67e5d6b1677c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e50391ca51e3f417d0532ca37d5764c3fcee1110d6d9c4a1f55d67e5d6b1677c?s=96&d=mm&r=g\",\"caption\":\"Viola Juuso\"},\"url\":\"https:\\\/\\\/euroports.fi\\\/en\\\/author\\\/viola-juusoeuroports-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa - Euroports Finland","description":"Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen 10 vuotta kest\u00e4neen Vectron-veturien nostoprojektin yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/euroports.fi\/en\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/","og_locale":"en_US","og_type":"article","og_title":"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa - Euroports Finland","og_description":"Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen 10 vuotta kest\u00e4neen Vectron-veturien nostoprojektin yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa.","og_url":"https:\/\/euroports.fi\/en\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/","og_site_name":"Euroports Finland","article_published_time":"2026-06-16T10:15:05+00:00","article_modified_time":"2026-06-16T10:15:06+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg","type":"image\/jpeg"}],"author":"Viola Juuso","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Viola Juuso","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#article","isPartOf":{"@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/"},"author":{"name":"Viola Juuso","@id":"https:\/\/euroports.fi\/en\/#\/schema\/person\/1a4b0c0893e447c80e5dbba4f43c9492"},"headline":"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa","datePublished":"2026-06-16T10:15:05+00:00","dateModified":"2026-06-16T10:15:06+00:00","mainEntityOfPage":{"@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/"},"wordCount":360,"commentCount":0,"publisher":{"@id":"https:\/\/euroports.fi\/en\/#organization"},"image":{"@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#primaryimage"},"thumbnailUrl":"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/","url":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/","name":"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa - Euroports Finland","isPartOf":{"@id":"https:\/\/euroports.fi\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#primaryimage"},"image":{"@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#primaryimage"},"thumbnailUrl":"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg","datePublished":"2026-06-16T10:15:05+00:00","dateModified":"2026-06-16T10:15:06+00:00","description":"Euroports on saanut menestyksekk\u00e4\u00e4sti p\u00e4\u00e4t\u00f6kseen 10 vuotta kest\u00e4neen Vectron-veturien nostoprojektin yhteisty\u00f6ss\u00e4 Siemens Mobilityn kanssa.","breadcrumb":{"@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#primaryimage","url":"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg","contentUrl":"https:\/\/euroports.fi\/wp-content\/uploads\/2026\/06\/P1020058-scaled.jpg","width":2560,"height":1920,"caption":"Vectron-veturi nostetaan raiteille"},{"@type":"BreadcrumbList","@id":"https:\/\/euroports.fi\/uncategorized\/lahes-10-vuoden-mittainen-vectron-veturien-nostoprojekti-paatokseen-hangossa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/euroports.fi\/"},{"@type":"ListItem","position":2,"name":"L\u00e4hes 10 vuoden mittainen Vectron-veturien nostoprojekti p\u00e4\u00e4t\u00f6kseen Hangossa"}]},{"@type":"WebSite","@id":"https:\/\/euroports.fi\/en\/#website","url":"https:\/\/euroports.fi\/en\/","name":"Euroports Finland","description":"T\u00e4yden palvelun satamaoperaattori.","publisher":{"@id":"https:\/\/euroports.fi\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/euroports.fi\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/euroports.fi\/en\/#organization","name":"Euroports Finland","url":"https:\/\/euroports.fi\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/euroports.fi\/en\/#\/schema\/logo\/image\/","url":"https:\/\/euroports.fi\/wp-content\/uploads\/2022\/01\/cropped-euroports_logo.png","contentUrl":"https:\/\/euroports.fi\/wp-content\/uploads\/2022\/01\/cropped-euroports_logo.png","width":350,"height":100,"caption":"Euroports Finland"},"image":{"@id":"https:\/\/euroports.fi\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/euroports.fi\/en\/#\/schema\/person\/1a4b0c0893e447c80e5dbba4f43c9492","name":"Viola Juuso","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e50391ca51e3f417d0532ca37d5764c3fcee1110d6d9c4a1f55d67e5d6b1677c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e50391ca51e3f417d0532ca37d5764c3fcee1110d6d9c4a1f55d67e5d6b1677c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e50391ca51e3f417d0532ca37d5764c3fcee1110d6d9c4a1f55d67e5d6b1677c?s=96&d=mm&r=g","caption":"Viola Juuso"},"url":"https:\/\/euroports.fi\/en\/author\/viola-juusoeuroports-com\/"}]}},"_links":{"self":[{"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/posts\/13097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/comments?post=13097"}],"version-history":[{"count":38,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/posts\/13097\/revisions"}],"predecessor-version":[{"id":13141,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/posts\/13097\/revisions\/13141"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/media\/13100"}],"wp:attachment":[{"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/media?parent=13097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/categories?post=13097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/euroports.fi\/en\/wp-json\/wp\/v2\/tags?post=13097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}